Skip to content
(863) 400-2934
Narrow concrete driveway under a porte cochere at a 1920s house in South Lake Morton, Lakeland

South Lake Morton · Lakeland

Concrete Contractor in South Lake Morton, Lakeland

Garage and workshop slabs off the alley, narrow driveways and front walks on the blocks north of Florida Southern College.

  • Free on-site estimate
  • Written quote within 48 hours
  • Clean jobsite when we leave
  • Licensed & insured

Free estimate in South Lake Morton

Takes about 30 seconds
What are we pouring?

No obligation. We call to set a time to measure, then send a written quote.

Got it. Thanks.

We'll call you shortly to set up a time to measure. Want to talk now? Call (863) 400-2934.

The straight answer

South Lake Morton was laid out on a grid with alleys, so a garage floor or workshop pad at the back of a lot can be poured from the alley, when the alley is open to a truck, instead of across the front yard. Lakeland Concrete Co is a concrete contractor in Lakeland for those rear slabs, plus narrow driveways, front walks and patios near Florida Southern College.

South Lake Morton at a glance

South Lake Morton is a 1920s Bungalow and Mediterranean Revival district on a grid with alleys and sidewalks, between Lake Morton and Lake Hollingsworth, with the Florida Southern College campus at its southern edge.

Alley access, narrow lots, porte cocheres and brick streets shape the layout and the setup on jobs here.

Permit office: City of Lakeland Historic Preservation (Minor Review) and Building Inspection · official page Paving and small accessory buildings are staff-level Minor Review; larger buildings go to the Design Review Committee before the building permit.

Bungalow blocks between Lake Morton and the Florida Southern campus

South Lake Morton and its twin, East Lake Morton, are what the city calls Lakeland's first-generation suburbs, lying mostly south and east of Lake Morton, north of Lake Hollingsworth and west of Ingraham Avenue. Building began around 1906, but most houses went up in the 1920 to 1926 boom, in Bungalow and Mediterranean Revival styles, on subdivisions laid out by John Morton, the Carter brothers, Columbus Deen and others. The city's district narrative lists the Florida Southern College campus among the areas of special character in the Lake Morton districts, between Frank Lloyd Wright Way and the north shore of Lake Hollingsworth at the southern boundary of South Lake Morton.

Lots are narrow, houses sit close to the street, and detached garages and porte cocheres are common. Lakeland Concrete Co pours rear slabs, driveways, walks and patios here and across our Lakeland neighborhoods. The lakefront blocks to the north have their own page at Historic Lake Morton.

Row of 1920s Bungalow houses on narrow lots with front walks in South Lake Morton, Lakeland
Narrow lots with houses set close to the street.

Pouring a garage or workshop slab from the alley

Where an alley runs behind the lot, that is the shorter way in for a rear job. A chute run or a small pump line from the alley can reach a detached garage floor without crossing the front walk, the porch steps or the lawn. At the visit we check the alley width, overhead lines, low branches and the gate or fence opening, because those decide whether the truck sets up behind the house or out front.

The building decides the paperwork. The guidelines treat accessory buildings of 300 square feet or less as staff-level Minor Review; bigger ones go to the Design Review Committee, which the city's design review page says averaged 24 days, against about one day for minor items. On the building side, Lakeland's forms page asks for sealed plans, a site plan and Florida Product Approval numbers for a site-built shed or garage, while a pre-made shed under 250 cubic feet and no taller than 5 feet needs no permit.

A garage or workshop floor prices as a concrete slab: $7 to $12 per sq ft at 4 inches reinforced, typically $2,000 to $7,500. A 20 by 20 workshop pad is 400 sq ft, about $2,800 at the low rate or $4,800 at the high one. A monolithic slab with thickened edges, for a garage that carries walls, costs more.

New concrete garage slab behind an older Lakeland house beside a residential alley
A rear slab poured from the alley side.

What It Costs

Our ranges for South Lake Morton work. Alley access, the size of the building on a slab and the brick at the curb are what we check before we price.

JobPer sq ftTypical projectWhat moves the price
Garage or workshop slab$7 to $12$2,000 to $7,5004 in. reinforced; monolithic or thicker priced higher; alley or front access
Side driveway, 10 ft or less$8 to $14$5,000 to $10,0004 to 5 in. broom finish; project range is a 2-car driveway; tear-out adds $2 to $4 per sq ft
Front walk$8 to $14$1,500 to $4,5004 in., 3 to 5 ft wide; steps and sidewalk tie-in
Back patio$8 to $14$2,500 to $6,500Plain or broom, about 250 to 450 sq ft
Stamped or colored$14 to $24$5,000 to $16,000Pattern, integral or release color, sealer

Ranges only. A firm price comes in a free written estimate after we see the lot and the alley.

Front walks on lots set close to the street

Houses in South Lake Morton sit close to the street, so the front walk is short and every foot of it shows. The guidelines describe historic walks as concrete or brick with a generally smooth surface, about three to four feet wide, and they call loose aggregate or stone the wrong material. A plain concrete walkway at that width, lined up with the front door, matches what the guidelines describe.

Unlike districts without sidewalks, these blocks have them, so a front walk here ends at a public sidewalk panel. That last joint is where we pay attention. We set an isolation joint where the new walk meets the city sidewalk, match its height so nobody trips at the seam, and keep our pour on the private side unless a right-of-way permit covers the panel. Between the porch and the sidewalk, a short walk may need a step or two, and we measure the rise at the visit so the steps come out even.

The guidelines also accept driveway and walk replacements done together with a compatible layout and matching materials. If both are tired, one plan and one pour day saves a second setup. A walk runs $8 to $14 per sq ft with us, and short runs hit a job minimum.

Short concrete front walk with steps meeting a public sidewalk in a Lakeland historic district
A short walk tied into the city sidewalk.

Brick at the curb and the Frank Lloyd Wright Way corridor

Many streets in the Lake Morton districts are paved with original or replacement brick, and the guidelines list altering brick streets at curb cuts, or changing the paving material there, as not acceptable. The brick stays. A new apron is formed to meet it, with the seam between brick and concrete kept tight and level, and that detail goes on the site plan before the review is filed.

The city's narrative also names the Frank Lloyd Wright Way commercial corridor, between S. Florida Avenue and Pennsylvania Avenue, as an area of special character in the Lake Morton districts. The Garden District overlay sits on part of East Lake Morton, not here. If your lot is on the corridor, ask Historic Preservation early whether anything extra applies; the office is listed on the city's design review page.

The apron and any public sidewalk panel are city right-of-way. That work takes a Right-of-Way Use Permit, follows the city's Engineering Standards Manual and is inspected by Public Works Engineering. Our Lakeland permit guide covers that permit and the Notice of Commencement rules (recorded over $2,500, a copy to the city over $5,000).

How Your Job Goes

  1. Check the alley and the lot

    We measure the work, the alley width and the gate, and look for overhead lines and low branches.

  2. Price in writing

    Within 48 hours you get square footage, thickness, finish and any right-of-way work listed.

  3. Review, then permits

    The site plan goes to Historic Preservation first, then Building Inspection issues the permit.

  4. Pour from the easier side

    We set up in the alley or out front, compact the base, pour, finish and cut joints.

  5. Cure

    We cover the slab and tell you when feet, then cars, can go back on it.

Ten feet under a porte cochere: sizing the driveway

Driveways in the district typically run along one side of the house to a porte cochere, carport or garage at the side or rear, and the guidelines list driveways over ten feet wide as not acceptable. On a narrow South Lake Morton lot, the porte cochere can set the width before the guideline does. We measure between its columns and keep the new driveway inside that opening with room for mirrors.

Tandem parking for two cars along the side of the house is acceptable under the guidelines, and extra width for front-yard parking is discouraged. If you need a third space, ask Historic Preservation about the rear of the lot before anyone draws a wider driveway out front. Our historic district driveway guide explains the Minor Review that every paving job here goes through.

Here's the math on a narrow lot. A 10 by 60 foot driveway is 600 sq ft, and at our concrete driveway rate of $8 to $14 per sq ft that comes to about $4,800 at the low rate or $8,400 at the high one, plus $2 to $4 per sq ft to remove the old one.

Back patios, pool plans and what to bring to the estimate

A back patio falls under the guidelines' Minor Review item for "any permanent paving on a property," so it can share one site plan with a driveway or walk; Historic Preservation confirms the call. Plain or broom finish runs $8 to $14 per sq ft, typically $2,500 to $6,500 for 250 to 450 sq ft. Stamped concrete runs $14 to $24 per sq ft. The guidelines don't name it, so send Historic Preservation a sample photo before you choose a pattern. Pools are on the guidelines' Minor Review list too; if a deck is part of the plan, ask how it's classified.

If a live oak shades the yard, remember that the guidelines rule out cutting large shade trees, so a patio edge may curve around a root zone instead of running square.

For the estimate, have your address, a sketch or photos, the size of any building that will sit on a slab, and whether the alley behind you is open to a truck. The Lake Hollingsworth page covers the blocks around the lake on the far side of campus.

Common Questions

Can the concrete truck reach my garage from the alley?
If an alley runs behind you and a truck can use it, yes. The Lake Morton districts were laid out with a network of alleys, and a rear garage floor is easier to pour from behind than across the front yard. What decides it is the alley width, overhead lines, low branches and the gate or fence opening. We check all four at the visit and say in the quote where the truck will set up.
My workshop will be bigger than 300 square feet. What changes?
The review track. The guidelines keep accessory buildings of 300 square feet or less at staff-level Minor Review, which the city says averages about a day. A bigger building goes to the Design Review Committee, which averaged 24 days. A site-built workshop also needs sealed plans and a site plan for the building permit. Pour the slab after both.
Is the Florida Southern College campus part of the South Lake Morton district?
The city's narrative counts the campus as an area of special character within the Lake Morton districts, between Frank Lloyd Wright Way and the north shore of Lake Hollingsworth at South Lake Morton's southern boundary. The city also lists the main campus as a National Register Landmark District. The college counts more than a dozen Frank Lloyd Wright structures there. For a house on the blocks north of campus, the same Minor Review rule for paving applies.
Does a small prefab shed on a new pad need a permit and a review?
Two separate answers. On the building side, Lakeland's forms page says a pre-made shed under 250 cubic feet and no more than 5 feet tall needs no permit. On the historic side, the guidelines list accessory buildings of 300 square feet or less, sheds included, as a staff-level Minor Review item. Plan on the staff review even when the building permit is not needed.
How wide can the driveway under my porte cochere be?
No wider than ten feet under the guidelines, and the porte cochere columns may set a narrower limit. We measure the opening and keep the new driveway inside it with room for mirrors. Tandem parking for two cars along the side is acceptable; extra width for front-yard parking is discouraged.
Can my new front walk tie into the city sidewalk?
Yes. We set an isolation joint where your walk meets the public sidewalk and match its height so the seam stays flat. If a sidewalk panel itself has to be replaced, that is right-of-way work that needs a Right-of-Way Use Permit and a Public Works Engineering inspection, so we put it on the quote as its own line.

Sources

Lakeland Neighborhoods We Pour In

If your address is inside Lakeland city limits, you're in our range. Don't see your neighborhood? Call anyway.

Garage slab or driveway near Florida Southern?

Call (863) 400-2934 or send your address and a photo of the alley through our contact page, and we'll set a visit.

(863) 400-2934 Request a Free Estimate
Call NowFree Estimate