Lakes at Laurel Highlands at a glance
The Lakes at Laurel Highlands is a D.R. Horton community inside Lakeland city limits, with an HOA managed by Artemis Lifestyles and published ARC guidelines that cover driveways, walks and patios.
Drainage and utility easements set the patio outline, preserves behind some lots are off limits to people and vehicles, and new concrete must match the builder's original slabs.
Permit office: City of Lakeland Building Inspection Division · official page ARC approval first, then the city permit; the HOA's approval does not replace it, and street-side work needs a Right-of-Way Use Permit.
Your HOA gets a say before the concrete truck does
The Lakes at Laurel Highlands is a D.R. Horton community inside Lakeland city limits, in Polk County, with an HOA managed by Artemis Lifestyles. The association posts its Architectural Review Committee (ARC) guidelines and bylaws on the community website, and those set the order of any concrete job here.
The guidelines list driveways, sidewalks, drainage work and any exterior addition as improvements that need the ARC's written approval, and they say an owner shall not apply to any government agency for a building or other permit until that approval is in. So the sequence is quote, ARC application, ARC approval, city permit, pour. Each improvement goes on its own application, so a driveway widening and a back patio are two filings, not one. Our concrete driveways page covers the slab itself, and the Lakeland service area page lists the other neighborhoods we pour in.

What the ARC guidelines say about driveways, walks and patios
The Lakes at Laurel Highlands ARC guidelines are short on concrete but firm. Driveway and sidewalk surfaces must stay consistent with the original materials and colors, and driveways are expected to stay free of oil, gas and other stains. A widening has to read as part of the builder's slab, so a new color on an extension is a poor bet. The same goes for a front walkway.
Patios must be pavers or concrete and match the home's materials in color and type. They can't extend beyond the side plane of the house, and they can't sit on drainage or utility easements. A patio application needs a survey showing the location and a sample of the materials, and the guidelines make the homeowner responsible for having public and private utilities located before work starts. The ARC can also withhold approval over shape, size, color scheme and finish, so if you want a stamped or colored patio, ask before you pick a pattern. The guidelines also say plans for additions and alterations are to be prepared by an architect or engineer; ask the management company whether that applies to flatwork or whether dimensions on your survey are enough.

What It Costs
Our ranges for Laurel Highlands work. The ARC decides the outline and finish; these figures cover the concrete.
| Job | Per sq ft | Typical project | What moves the price |
|---|---|---|---|
| Concrete driveways | $8 to $14 | $5,000 to $10,000 | Widening vs. full replacement; tear-out adds $2 to $4 per sq ft |
| Concrete patios | $8 to $14 | $2,500 to $6,500 | Sized to the side plane and easements; future enclosure footprint |
| Concrete sidewalks and walkways | $8 to $14 | $1,500 to $4,500 | Matching the builder's walk; short runs hit a job minimum |
| Stamped and decorative concrete | $14 to $24 | $5,000 to $16,000 | Pattern and color the ARC approves |
| Concrete slabs and foundations | $7 to $12 | $2,000 to $7,500 | Thicker or monolithic slabs cost more |
Every job gets a free written estimate after we see the site. HOA and city permit fees are separate from the concrete price.
Timelines: the 30-day review, then the city
- Walk-through and measurements. We mark the slab outline on your lot and write down thickness, finish and joint layout.
- Survey, plat and sample. Every application needs a site plat showing the approximate location and dimensions of the work. Our quote gives you the numbers to draw on it, and a materials sample goes with a patio request.
- Two copies to the management company. The guidelines ask for an original and one copy of each application, which get date stamped and logged. The ARC approves or disapproves within thirty days of receipt, and your copy comes back with the letter.
- Changes mean resubmitting. If the size or shape changes after you file, the application goes back to the ARC, so settle the outline before you submit.
- City paperwork, then the pour. Approval doesn't mean local, state or federal requirements are met; the owner makes sure permits are in place before work starts.
Call us before you submit, not after, so the quote can go into the package.

Curbs, sprinkler heads and preserves on pour day
When the work is done, a representative of the ARC inspects it for compliance. The guidelines also say any damage the project causes to common areas, landscaping, sidewalks, drainage, streets, curbs, irrigation or sprinkler heads is the owner's to repair, and if the owner doesn't, the association can fix it and charge an individual assessment. On a concrete job that mostly means the path the ready-mix truck takes and where it parks while it pours.
So plan the route at the estimate. We look at where the truck can stand, whether a pump or wheelbarrows keep it off the curb and the public sidewalk, and where the sprinkler heads sit along the slab edge. Take your own photos of the curb, the sidewalk and nearby heads before the crew arrives. Lakes at Laurel Highlands lots that back onto a preserve need one more check: the guidelines put all preserves under conservation easements, and no persons or vehicles are allowed in them at any time. Forms, spoil and the truck stay on your side of the line, and so does the old concrete from any tear-out, which adds $2 to $4 per sq ft.
How Your Job Goes
Measure and mark
We walk the lot, mark the outline and check easements on your survey.
Quote for the ARC package
Your written quote lists the dimensions, thickness and finish for the site plat and sample.
Wait for the letter
The ARC rules within 30 days; the city permit is filed only after approval.
Plan the truck route
We set where the truck stands so curbs, sidewalks and sprinkler heads stay clear.
Pour, cure and final look
We pour, cure the slab and leave it ready for the ARC's completion inspection.
Which City of Lakeland office handles a Lakes at Laurel Highlands pour
The neighborhood sits inside Lakeland city limits, so the City's Building Inspection Division is the permit office, through its iMS ePlan system, and Public Works Engineering inspects residential driveways. Anything at the street, such as an apron or a walk that meets the curb, needs a Right-of-Way Use Permit from Public Works Engineering as well.
One money line matters here. When the direct contract is greater than $5,000, Florida Statute 713.135 requires a copy of the recorded Notice of Commencement to be filed with the permit office before the first inspection. A two-car driveway in our $5,000 to $10,000 range sits right on or above that line, so we flag it in your quote. The Lakeland concrete permit guide walks through every city step, including the $7,500 exemption that isn't automatic.
Patios now, screen enclosures and pools later
A patio can be the first half of a bigger project. The guidelines allow screen enclosures on the rear of the house only, not past the plane of the house and not over an easement, the same limits the patio has. Pour the slab to the footprint an enclosure could use and both approvals line up. A pool can't go in the front or side yard, and its gutters and downspouts may have to tie into an underground drainage system, so leave room for that before the deck goes down. Our concrete patios page covers thickness and finishes, and the patio cost guide prices common sizes.
Two requests the guidelines answer for you. A parking pad for a boat, canoe or kayak won't help, because watercraft must be kept inside the garage with the door closed, and garage conversions aren't permitted. A wider driveway for a second car goes to the ARC like any driveway change, matched to the original concrete. For a pad under equipment or a thicker slab, see concrete slabs and foundations. Our Grasslands and Oakbridge pages cover those neighborhoods, and in Historic Dixieland and Historic Beacon Hill new paving goes through the city's historic review.
Common Questions
How long does the Laurel Highlands ARC take to respond?
Do I need a separate ARC application for a driveway and a patio?
How far can a patio extend in Laurel Highlands?
Who pays if the concrete truck damages a curb in Laurel Highlands?
Can I change the color of my driveway extension?
Can I pour a pad for a boat or trailer in Laurel Highlands?
Does ARC approval mean I don't need a city permit?
Sources
- The Lakes at Laurel Highlands (Lakes at Laurel Highlands HOA)
- Architectural Review Committee Guidelines (Lakes at Laurel Highlands HOA)
- Building Inspection (City of Lakeland)
- Engineering Permit Inspection Information (City of Lakeland Public Works Engineering)
- Florida Statutes 713.135 (Florida Legislature)
- Census Geocoder: Lakes at Laurel Highlands street address (U.S. Census Bureau)